CLICK HERE FOR TECHNOLOGYSTUDENT.COM

THE MAIN RESOURCE OF THIS SITE

 

 
 
SCHEME OF WORK - PAGE TWO - W.A.T.T. QUALITY AWARD
Year 7 Structures Project

     
   
HWK=Homework N=Numeracy C=Citizenship L=Literacy ICT=Information Technology

STAGE

ADDITIONAL SKILLS

EXTENSION WORK

RESOURCES

Stage Five: The pupils will be asked to design a bridge to span a valley. They will be given a simple diagram of a valley and asked for suggestions regarding the type of bridge that would be most suitable. They will be asked to justify their choice. This initial planning will be carried out in pairs. As a resource the pupils will be asked to access the Technology Intranet Site or the Adobe Reader version of ’Structures’ - viewing the history of bridges. They will list reasons for their choice. They will then present their findings to the class.

L. Pupils read through design problem with staff. Problem discussed.

N. Statistics relating to distance to be spanned and number of vehicles crossing, discussed.

C. Importance of new bridge to the community explained. Procedure for planning applications, enquiries ……

HWK. Two basic ideas and one final annotated idea.

Produce a poster to advertise the new bridge as a tourist attraction.

Computer suite

Adobe Reader or Website version of ‘Structures’Internet site (structures section) used where necessary.

Stage Six: The pupils will be shown how to present possible designs for their bridge solution. The following will be explained: The construction of a border and title block. The presentation of the drawing. The use of labels. The use of word processed notes.

Stage Seven: ‘Triangular Structures’. The pupils will be introduced to the importance of the triangle as a part of many structures. They will be shown a simple demonstration using straws which will demonstrate the strength of a triangle composed of one straw as opposed to a straw lying horizontally. The pupils will be shown how to construct a simple girder bridge from straws. The bridges will be decorated with designs based on existing bridge types. These will be tested to destruction.

L. Create a sequence drawing with notes, explaining every stage of manufacture.

N. Basic measurements of the bridge discussed.

HWK. While manufacturing roughout sequence drawing and complete accurately at home (notes included).

C. Pupils work together in teams, emphasis placed on team work and cooperation.

ICT. Draw at least one stage of construction using a graphics piece of software.

Art straws

Internet site (structures section) used where necessary. Internet site (structures section) used where necessary.

Stage Eight: While constructing the girder bridge the pupils will draw each stage of making the model. This will be roughed out and simple notes will be added. The importance of writing the notes will be emphasised and so will the overall presentation. The pupils will be introduced to the concept of a sequence drawing. Using their rough notes they will carefully draw the stages of manufacture, adding appropriate notes. The use of a title block, border line and guidelines for notes will be demonstrated. Colour / shade will be added.

COPYRIGHT AND DISCLAIMER